Knockdown Rebuild FAQs

When should I speak to a builder about a knockdown rebuild?

Early, before you commit to plans, a demolition date or accommodation. The site, the budget and any planning controls shape what is possible. The sooner they are understood together, the fewer decisions need revisiting. Our first conversation is about exactly that fit, with no obligation.

Will you assess whether my block suits a rebuild before I commit?

A good builder should, because a block and a budget can pull in different directions. At Latitude 37, our first meetings explore your brief against your budget and the constraints and opportunities of your site. We will tell you honestly if the fit is not right.

Who organises demolition on a knockdown rebuild?

It varies between builders, so ask each one. At Latitude 37, many clients choose to coordinate the demolition themselves, in parallel with us working on their documentation, approvals and contract. Others prefer us to handle it, and we offer either option. We can obtain quotes from trusted demolition contractors and guide the timing.

Will my knockdown rebuild need a planning permit?

Some rebuilds need one as well as a building permit, depending on the controls on the site, such as heritage or neighbourhood character overlays. We look at it early because it affects the timeline more than almost anything else.

How long should I allow for a custom knockdown rebuild?

A custom home typically takes two to three years in total. That depends on the complexity of the project and how quickly you move through the design stages. Concept design usually takes around three to four months, and can be quicker when you are ready to move. Interior design, project documentation and approvals usually take eight to twelve months: shorter if no town planning approval is required, longer if it is. Construction usually takes ten to eighteen months, with a typical home taking around twelve.

How much does a custom knockdown rebuild cost?

It depends on your site, the scale and complexity of the home and the level of finish, so a rate per square metre will not tell you much. Latitude 37 builds custom homes from $1.5 million to $5 million and above. Your budget and brief are set at the outset and the design is developed to suit them. If you coordinate demolition yourself, its cost sits outside the build price.

Can you rebuild on a sloping or constrained site?

Yes. Slope, difficult access, significant trees and overlays are the conditions a site-led design responds to, rather than works around. They can affect cost and build time, which is why we look at them from the first conversation and build them into your brief and budget from the start.

Can I plan my move before the design is finished?

Talk to us before you commit to a demolition date or make accommodation plans. The timing depends on approvals, how demolition is arranged and the construction program, and we will work through it with you early.