What does each kind of rebuild ask of you?
The honest difference between the two kinds of rebuild is how much they ask of you.
A package has already answered hundreds of questions. Where the kitchen goes, how the roof drains, which window is where. Your decisions are the ones the menu leaves open, and the timeline is shorter because most of the work was done before you arrived.
A custom rebuild asks you to resolve those questions with a design team, and it asks for your time to do it. At Latitude 37 we start by agreeing your budget and brief, then design your home in Concept Design to suit your brief, your site and that budget. Once you’re happy with the design, a Custom Home Proposal prices it before you commit to documentation. It is a detailed, scope-based estimate of the proposed inclusions, key allowances and assumptions. As the documentation develops, allowances are replaced with firm pricing, and the Fixed Price Building Contract that follows sets out the agreed scope, price and exclusions. It takes longer than choosing from a range because it is doing more. Typically, a custom home takes two to three years in total, with construction itself usually taking ten to eighteen months.
Demolition is its own piece of work in either kind of rebuild. It has its own permits, its own service disconnections and its own conditions on asbestos, trees and neighbours, so ask any firm, package or custom, how it is arranged and what its figure includes. At Latitude 37, many clients choose to coordinate the demolition themselves, in parallel with us working on their documentation, approvals and contract. Others prefer us to handle it. We offer either option, and we can obtain quotes from trusted demolition contractors and guide the timing. We have also written about what actually drives the cost of a custom home, and the site conditions that article describes apply to a rebuild block exactly as they do to a vacant one.
A rebuild also affects family life, not just the block. Talk to us before you commit to a demolition date or make accommodation plans. The timing depends on approvals, how demolition is arranged and the construction program, and we’ll work through it with you early.