How do the two routes differ?
In the separate route, you engage an architect or designer independently and appoint a builder separately. The designer develops the design with you, consultants such as engineers are brought in, and the documentation is completed and priced by builders. The designer may remain involved during tendering and construction, depending on the scope of their engagement. Either way, you hold two appointments, one with the designer and one with the builder.
In the integrated route, one firm designs, documents and builds the home. At Latitude 37 the design is developed by our in-house design team, and the documentation is prepared in house too. We do not outsource our drafting. Pricing develops alongside the design rather than after it.
Both routes can produce a well-resolved custom home. The differences sit across several considerations.
Design relationship. In the separate route, the designer is engaged independently. In an integrated firm, the designer sits within the business that delivers construction.
Builder selection. The separate route lets you tender completed documentation to several builders. With an integrated firm, the builder is generally chosen from the outset.
Cost feedback. In the separate route, cost information often becomes more detailed once design and documentation are complete. In an integrated firm, construction pricing can inform the design as it develops.
Coordination. Separate appointments mean the designer’s and builder’s roles need to be coordinated. In an integrated firm, that coordination happens within one organisation.
Design continuity. In the separate route, continuity depends on how involved the designer stays during construction. In an integrated firm, the design and construction teams remain connected throughout.
Accountability. In the separate route, responsibilities sit across separate appointments. In an integrated firm, greater responsibility sits with one firm.
Who each route suits. The separate route tends to suit clients who put independent design or competitive tendering first. The integrated route tends to suit clients who value continuity and want design and cost considered together from the start.
The rest of this article looks at the considerations that matter most in practice, starting with the one we have learned most about in 20 years of running an integrated model: where information gets lost between design and construction.